Block D1

Block D1
- Property Type
- Houses
- Levels
- 3 levels
- Size
- 3 & 4 bedroom
In progress75%
Follow the progress of Block D1 from the first brick!
Internal Fit Out
Start May 2026
Status: in progress
From the outside at least, the buildings will soon begin to look like a finished article. Soon, families will start to move in, but before that, the building needs an interior. There are walls, a roof, and windows, but there is still a good deal of work to be done to prepare for residents.
This milestone includes
Screed
Start May 2026Expected to end June 2026
During this step, a concrete finisher performs a process called screeding. This is cutting off excess wet concrete to bring the top surface of a slab to the proper grade and smoothness.
The first fix: dry lining
Start May 2026Expected to end July 2026
Dry-lining a wall means attaching plasterboard to a wall, which gives a smooth finish to decorate straight away.
Stairs
Start July 2026Expected to end August 2026
Skilled workers will arrive to fit and add fixtures, but they'll need stairs to get that plan off the ground floor.
The first fix: plumbing and electrics
Start August 2026Expected to end November 2026
Now that the house has a structure, workers will install the essential components to make it a home. This includes the electrics, plumbing and ventilation. Part of the first fix is the installation of cables, wires, pipes and other hidden fixtures.
Closing up the walls and dry lining
Start September 2026Expected to end October 2026
Before the second fix, plasterers will carefully close up and finish the interior walls.
Kitchen Installation
Start November 2026Expected to end January 2027
During this process, the team will install the kitchens and internal doors, skirtings and architraves.
The second fix
Start January 2027Expected to end January 2027
As soon as the plasterers and carpenters have completed the dry lining, the skilled workers will return to convert wires into sockets, and pipes into taps.
Wall Tiling
Start January 2027Expected to end January 2027
Tiles will be added to the kitchen and bathroom walls.
Flooring covering
Start February 2027Expected to end February 2027
Powering up
Start November 2026Expected to end December 2026
For the first time the building will be connected to the Grid. Water, gas and electricity will flow through its pipes, and there will be light, heat, hot and cold water.
Decoration
At this point the painters and decorators will return to add the final touches to the interiors. At this stage, the project is in the final phase of preparation for the first householders. Before we can allow anyone to cross the threshold however, we have our own housekeeping to complete. Stage Five: The completed build.