Follow the progress of Block D2 from the first brick!
Internal Fit Out
Start March 2026Expected to end
Status: in progress
From the outside at least, the buildings will soon begin to look like a finished article. Soon, families will start to move in, but before that, the building needs an interior. There are walls, a roof, and windows, but there is still a good deal of work to be done to prepare for residents.
This milestone includes
Screed
Start March 2026Expected to end June 2026
During this step, a concrete finisher performs a process called screeding. This is cutting off excess wet concrete to bring the top surface of a slab to the proper grade and smoothness.
The first fix: dry lining
Start March 2026Expected to end July 2026
Dry-lining a wall means attaching plasterboard to a wall, which gives a smooth finish to decorate straight away.
The first fix: plumbing and electrics
Start March 2026Expected to end June 2026
Now that the house has a structure, workers will install the essential components to make it a home. This includes the electrics, plumbing and ventilation. Part of the first fix is the installation of cables, wires, pipes and other hidden fixtures.
Stairs
Start December 2025Expected to end July 2026
Skilled workers will arrive to fit and add fixtures, but they'll need stairs to get that plan off the ground floor.
Closing up the walls and dry lining
Start April 2026Expected to end June 2026
Before the second fix, plasterers will carefully close up and finish the interior walls.
Kitchen Installation
Start June 2026Expected to end July 2026
During this process, the team will install the kitchens and internal doors, skirtings and architraves.
The second fix
Start June 2026Expected to end September 2026
As soon as the plasterers and carpenters have completed the dry lining, the skilled workers will return to convert wires into sockets, and pipes into taps.
Wall Tiling
Start Expected to end
Tiles will be added to the kitchen and bathroom walls.
Flooring covering
Start Expected to end
Powering up
Start Expected to end
For the first time the building will be connected to the Grid. Water, gas and electricity will flow through its pipes, and there will be light, heat, hot and cold water.
Decoration
Start Expected to end
At this point the painters and decorators will return to add the final touches to the interiors. At this stage, the project is in the final phase of preparation for the first householders. Before we can allow anyone to cross the threshold however, we have our own housekeeping to complete. Stage Five: The completed build.
Materials used

Standard Door Handle
Dos Lever On Rose Door Handles Satin Chrome
Location Internal

Internal Prem Door
Premdor Moulded Horizontal 4 Line White Primed Internal Door
Location Internal
Cookie Control
We use necessary cookies to make our site work. We would also like to use optional cookies to improve our online services, give you the best website experience possible and deliver tailored content, on and off our site. We will not set any optional cookies unless you enable them.
Necessary Cookies
Some cookies are needed for the website to work – for instance when the site requires login access, we use cookies so that you aren’t required to enter them again as you move throughout the website. You can’t switch these cookies off.
Analytics Cookies
We use these cookies to track and analyse how you use our website. For example, which pages you visit, or whether you view content or download documents. We use this information to improve our online services and give you the best website experience possible through more relevant and personalised content. You can switch these cookies on or off at any time. Third-party analytics are set by Google Analytics. For more information visit Google Analytics privacy policy.
We use cookies - to ensure that we give you the best experience on our website. By accepting we'll assume that you are happy to receive all cookies on our website. However, if you would like to, you can change your cookies settings at any time.
Manage Cookies